Product Details:
|
Finish: | ZINC, Plain | Material: | Stainless Steel, Steel |
---|---|---|---|
Standard: | DIN | Head Type: | Custom Special Head |
Service: | OEM Customized Design | Delivery Time: | In Stock 5~7 Working Days, Customized 15~25 Working Days |
Package: | Small Packing+Carton Packing+Pallet | Reliability Test: | Mechanical Dimentions, Hardness Test.Salt Spray Endurance Test |
MOQ: | 1 Piece In Stock, 30,000 Pieces Customized | ||
Highlight: | Partial Thread Countersunk Phillips Screw,316L Stainless Countersunk Phillips Screw,PVD Coated Countersunk Phillips Screw |
Our Cobalt Blue PVD Coated Countersunk Phillips Screw combines the superior corrosion resistance of 316L stainless steel with a striking cobalt blue finish for applications demanding durability and visual appeal. Featuring a partial thread design for controlled grip and reduced friction, this screw is engineered for precision fastening in marine, medical, luxury automotive, and architectural installations. The PVD (Physical Vapor Deposition) coating enhances wear resistance while delivering a vibrant, fade-resistant cobalt blue finish.
✅ Cobalt Blue PVD Coating
✅ 316L Stainless Steel
✅ Partial Thread Design
✅ Countersunk Phillips Head
More Detail Informations
|
|
|
Available Material
|
1.Stainless Steel: SS303, SS304, SS316, SS410, SS420;
2.Carbon steel: C1006,C1010,C1018,C1022,C1035K,C1045; 3.Brass: C3602,C3604,Hpb59,Hpb62,Hpb65,Hpb58,Hpb70 ; 4.Aluminum: Al6061, Al6063 etc or as your requirements |
|
Head type
|
CSK Head,Pan Head,Truss Head,Hexagon Head,Round Head,Oval Head,Button Head,Cap Head,Cheese Head,etc.
|
|
Hardness
|
Carbon Steel:HRC:28~35 ,HV450~700
Alloy Steel:HRC:32~39(grade10.9) HRC:39~44(grade12.9) |
|
Finish
|
Zinc plated, Nickel plated, Bronze, Copper,Phosphate, Oxidation black, Passivation, Tin, Dacromet, Gold, Chrome, Silver,
Phosphorization,Zinc-nickel alloy plated etc. |
|
Sample Available
|
The sample is free of charge if we have the existing tooling,you only need to pay for the freight cost
|
|
Delivery time
|
Samples time 3-5 working days, Lead time 20-25 working days
|
|
Pricing Term
|
EXW Dongguan(FCA),FOB, CIF, CNF, DDU,etc.
|
|
Packing
|
Bulk in PE bag or Small boxes.then in carton .pallet
|
|
Payment term
|
TT (30% in advance as deposit, balance before delivery) , L/C, Western Union,PayPal etc
|
|
Management system
|
ISO9001:2015
|
|
Certificate
|
ISO,ROHS
|
Contact Person: Irene chen
Tel: +86-13527934468