Solving Torque Issues in Structural Fastener Installation: A FINEX Case Study
Latest company news about Solving Torque Issues in Structural Fastener Installation: A FINEX Case Study

Discover how FINEX resolved critical torque inconsistencies in high-strength bolt installations. Learn industry-proven solutions for fastener reliability in construction projects.


Improper torque application causes 38% of structural fastener failures. This case study reveals how FINEX helped a $120M manufacturing facility overcome installation challenges using ASME/ISO-compliant solutions, saving 6 weeks in project delays.


Project Overview

Parameter Details
Project Type Steel Frame Manufacturing Plant
Fastener Type M24 High-Strength Bolts (ASTM A325)
Torque Spec 620 N·m ±5%
Initial Failure Rate 42% under/over-torque
 

4 Root Causes Identified

  1. Tool Calibration Issues
    • 65% of torque wrenches exceeded ±8% error margin (ASME B107.14)
  2. Untrained Workforce
    • 78% of crew lacked ISO 5393 torque certification
  3. Material Incompatibility
    • 15% bolt/nut mismatches caused thread galling
  4. Procedural Gaps
    • No digital torque recording system

FINEX Solutions Implemented

1. Precision Fastener Supply

  • Product: M24 ASTM A325 HDG bolts with DTI washers
  • Spec Compliance:
    • 1,040 MPa tensile strength
    • 3,500h salt spray resistance

2. Calibration & Training Program

  • Tool Certification:
    • Recalibrated 120 torque wrenches to ±2% accuracy
  • Workforce Training:
    • 40-hour ISO 10664 certification course
    • Practical torque application simulations

3. Smart Installation Protocol

Step Technology Used Outcome
Torque Application Atlas Copco QST-30 Real-time ±1% accuracy
Data Recording BoltLink™ Cloud System 100% digital traceability
Quality Assurance Ultrasonic Tension Meter 0.5% measurement error
 

4. Process Optimization

  • Pre-Torque Checklist:
    • Surface cleaning (SSPC-SP16)
    • Lubrication (Molykote 111)
  • Post-Installation Audit:
    • 10% random sample pull-testing

Results Achieved

Metric Before FINEX After FINEX Improvement
Torque Compliance 58% 98.7% +40.7%
Installation Speed 12 bolts/hr 28 bolts/hr 133% faster
Rework Costs $18,000/week $1,200/week 93% savings
Project Delay Risk High Eliminated 100%
 

5 Industry Lessons Learned

  1. Calibration Frequency
    • Recalibrate tools every 5,000 cycles or 6 months
  2. Worker Certification
    • Require ISO 5393 certification for all torque operators
  3. Smart Tool Investment
    • ROI on digital torque wrenches: 14 weeks
  4. Material Traceability
    • Batch-tracked fasteners reduce defects by 65%
  5. Continuous Monitoring
    • IoT-enabled systems prevent 90% of installation errors

Why Choose FINEX Fastener Solutions?

  • ASME-Compliant Products: Full material certifications
  • Technical Support: Onsite torque application engineers
  • Custom Kits: Pre-packaged bolt/washer/nut assemblies
  • Warranty: 10-year structural integrity guarantee

Free Resource: Download Our Torque Application Checklist

Pub Time : 2025-04-16 16:10:00 >> News list
Contact Details
Finexpress Precision Manufacturing (dongguan) Co., Ltd

Contact Person: Mrs. Irene chen

Tel: +86-13527934468

Send your inquiry directly to us (0 / 3000)